Updating the BPC Workflows
Prerequisites
-
You have executed the INUBIT patch installer using the Business Process Center option in the Choose Install Set dialog.
-
You are logged in as
root
administrator to the INUBIT Workbench.
Proceed as follows
-
Switch to the BusinessProcessCenter additional user group using the File > Switch to additional user group > BusinessProcessCenter menu.
-
Import the updated BPC workflows using the Edit > Import > INUBIT diagram(group) menu.
-
Choose the new
BusinessProcessCenter-workflow-patch-<bpc-version>.diagrams.zip
file from the<bpc-installdir>/bpc_modules
directory. -
Choose the BusinessProcessCenter user group in the User/User group section.
-
To prevent both the System Connector settings and the variable values from being overwritten, deactivate the corresponding option.
-
-
Click Finish to start the import.
→ The updated BPC workflows are added as a new version of the already existing diagrams.
Check the configuration at least in the following updated workflows.
-
BPC_199_BPC_Configuration: Configure in order that BPC and INUBIT can communicate correctly, refer to Configuring BPC Monitoring Settings
-
BPC_299_PM_Configuration: Configure if the BPC Process Monitor module shall be used, refer to Configuring Grid initially
-
BPC_399_Converter_Configuration: Configure if the BPC Converter module shall be used, refer to Configuring the BPC Database Connection
-
BPC_499_VAM_Konfiguration: Configure the organization ID if the Data Management module shall be used
-
BPC_doc_Konfiguration: Configure the variables mapping of the BPC_doc_initializeConfig module as described in the comments of the workflow if the BPC Documentation module shall be used.